- Shop
- About
- Clearance sale
- Project
- News
- Recruitment
- Contact us
- Agency policy
- Technical assistance
Safety warning for the installation of stainless steel fluted panels.

1 BEFORE CONSTRUCTION

Direct tiling requires the wall surface to be flat, with a difference of ≤2mm/1m.

The panels are mounted on a frame with padding (when the wall is damp or uneven). The distance between the frame members should be ≤35cm.

Stainless steel wave pattern without flooring

Stainless steel wave-shaped louvers without ceiling cladding
2 DURING CONSTRUCTION

Do not remove all protective film from the stainless steel cladding panels during installation.

Wear protective gloves when handling splints to avoid cuts from sharp edges.

Drill pilot holes in the stainless steel plate before securing it with stainless steel screws.

Install the spacer between the frame and the stainless steel plate.

Apply adhesive evenly to the back of the stainless steel plate and the surface of the installation area.

Place the male and female grooves next to each other, do not overlap.
3 AFTER CONSTRUCTION

Avoid rubbing hard or sharp objects against the surface.

Clean with a damp cloth and dry immediately.

Use a mild, neutral detergent.






