Safety warning for installation of flexible stone cladding panels.

banner-safety-warning-flexible-leather-cover

1. Before installing flexible stone cladding panels

The construction surface must be firm, flat, dry, and free of grease and dust.
The application surface must be firm, level, dry, free of oil, grease, and dirt.
It is mandatory to use an alkali-resistant primer on the surface of a new ceiling.
Alkali-resistant primer is mandatory for new wall and ceiling surfaces.
can-type-of-bottle-son-bong-troc-gach-nut-doi-be-mat-tuong-tran-cu
Peeling paint/cracked tiles need to be removed from old wall and ceiling surfaces.
Waterproofing treatment needed for construction areas with high humidity.
Waterproofing treatment is required for construction areas with high humidity.
Ceiling construction should be done on a rigid gypsum board (Calcium Silicate) or plywood subfloor.
Ceiling construction should be done on a rigid gypsum board (Calcium Silicate) or plywood subfloor.
The optimal construction temperature is between 5°C and 35°C.
The optimal working temperature is between 5°C and 35°C.

2. During the installation of flexible stone cladding panels.

Warning about adhesives

You should choose a type of glue with low or no alkali content to avoid salt absorption.
It is advisable to choose adhesives with low or no alkalinity to avoid the "salt leaching" phenomenon.
Use neutral construction glue for interior areas.
Use neutral construction adhesive for interior areas.
Use specialized tile adhesive for exterior areas.
Use specialized tile adhesive for exterior areas.
Small-sized pipes (under 600x300mm) are glued onto the construction surface or the back of the panel.
For small sizes (under 600x300mm), apply adhesive to the installation surface or the back of the panel.
Large-sized panels (over 600x300mm) are glued onto both the construction surface and the back of the panel.
For large sizes (over 600x300mm), apply adhesive to both the installation surface and the back of the panel.

Warning about flexible stone cladding panels.

A gap of 1,5-3mm should be left between the panels to allow for thermal expansion and contraction.
A gap of 1,5–3 mm should be left between the panels to allow for thermal expansion and contraction.
The venous thrombosis will be relieved after at least 24 hours.
Only apply grout after at least 24 hours have passed since bonding.
It is recommended to use a temporary, fixed-position gun to avoid being caught while the glue is drying.
It's advisable to use a nail gun to temporarily secure the panel to prevent sagging while waiting for the adhesive to dry.
Always use diagnostic medication within the first 15-20 minutes of surgical intervention to allow for timely adjustments.
Always use a pressure gauge during the first 15-20 minutes (while the glue is still wet) to make any necessary adjustments.
Do not place excessively thick or heavy objects on the ceiling.
Avoid installing overly thick and heavy panels on the ceiling.
The wooden-handled tape with soft rubber backing is pressed into the grooves to ensure 100% adhesion across the surface.
For raised-edge surfaces, use a soft rubber squeegee to press into the grooves to ensure 100% adhesive coverage.

Warning regarding handling specific locations.

elephant-corner-cutting-new-branch-for-tight-grafting
For positive angles, miter cut (edge ​​grinding) to ensure a tight fit.
The base of the vein should be recessed at least 2-5cm from the base.
With a negative angle, the circuit trace should be set back at least 2,5cm from the corner.
Use a hairdryer or hot air blower to gently blow air onto the back of the face to increase flexibility before applying.
For curved edges, use a hairdryer or hot air gun to gently heat the back of the panel to increase flexibility before installation.
When drilling holes near the sign, use a sharp drill bit and drill slowly to avoid tearing the skin.
For surfaces with attached letters or signs, when drilling holes to attach the letter bases to the panel, use a metal drill bit and drill slowly to avoid tearing the flexible stone layer.

3. After installation of flexible stone cladding panels

Prevent damming, flooding, or landslides within the first 48 hours after construction.
Avoid stepping on, pouring water on, or vibrating the construction site for the first 48 hours after completion.
After 3-7 days, when the glue is completely dry, then proceed with the next decorating steps.
Wait 3-7 days (until the glue is completely dry) before proceeding with the next decorating steps.
Painting of rubbing with animals or stones
Avoid contact with hard or sharp objects.
For new stains, use a mild detergent.
For fresh stains, use a mild detergent.