Instructions for constructing 2-sided plastic partitions without leaving a walkway

Construction of 2-sided plastic partitions without leaving a walkway is a suitable choice when it is necessary to separate spaces, ensuring privacy for both areas. This wall has a relatively simple construction process but requires high precision in fixing.

Benefits of installing 2-sided plastic partitions in the middle of the room without leaving a walkway
Benefits of installing 2-sided plastic partitions in the middle of the room without leaving a walkway

Materials and tools to prepare: 2-sided plastic partition panel, bulkhead, special glue, anchors, bolts, screws, straight angle bracket/right angle bracket, and basic tools such as cutters, measuring tape, drills, and nail guns.

Tools for constructing 2-sided plastic partitions
Tools for constructing 2-sided plastic partitions

Step 1: Locate, measure and cut the base of the partition in case of no passage

To measure and install the partition accurately, follow these 3 steps:

1. Identify exact location of the partition installation.

2. Measurement overall size Cut the wall at 40° (compound angle) and 90° (straight connection).

Instructions on how to join right angle wall feet between wall and floor
Instructions on how to join right angle wall feet between wall and floor

3. For the foot of the wall Final (ceiling and floor), right slit in half lengthwise with length ≥400mm. This is necessary to thread the last baffle panel into the frame.

Instructions on how to split the wall base to insert the partition panel in case the construction does not leave a passageway
Instructions on how to split the wall base to insert the partition panel in case the construction does not leave a passageway
The frame has been slit at the base to accommodate the partition panel.
The frame has been slit at the base to accommodate the partition panel.

Step 2: Prepare holes to fix the frame 2-sided plastic partition without aisle

3 steps to create holes to fix the wall base to the floor, wall or ceiling.

1. Drill a pilot hole up the wall

Drill pilot holes into the bulkhead foot bar
Drill pilot holes into the bulkhead foot bar

2. Mark Location of holes drilled into floors, ceilings and walls.

Mark the locations of these holes on the floor, ceiling and walls.
Mark the locations of these holes on the floor, ceiling and walls.

3. Drill holes at the marked points on the construction site to prepare for closing plug

Drill holes at the marked points on the construction to install iron anchors/expansion anchors.
Drill holes at the marked points on the construction to install iron anchors/expansion anchors.

Step 3: Fix the partition legs

3 steps to fix the partition legs to the holes marked in step 2

1. Close the plug (hatching) into the bait hole

Plug the anchors into the drilled holes.
Plug the anchors into the drilled holes.

2. Apply special glue on the floor, wall, ceiling to fix the partition base.

Apply specialized glue to fix the wall base
Apply specialized glue to fix the wall base

3. Place the partition foot on the glued position, adjust the pilot hole on the partition foot to match the expansion bolt already installed on the wall. Then fix the stainless steel screw into the drilled hole and the expansion bolt through a 12mm wide straight bracket.

Install and tighten bolts/screws to secure the wall foot with straight brackets
Install and tighten bolts/screws to secure the wall foot with straight brackets

Note: The wall base frame must be tightly fixed at walls, ceilings, floors Use glue and nails to connect the corners.

Step 4: Install the partition panel in case of no passage

The partition panel is installed into the frame by the following 3 steps:

1. Cut the partition panel according to measured dimensions.

2. Install the wall panels one by one. into the frame groove, tightly fitted through the male and female groove structure.

Install the partition panels into the frame groove one by one.
Install the partition panels into the frame groove one by one.

3. For the last partition panel located close to the wall: The installation process of right angle (25mm) and screw to fix the partition panel to the wall (distance between brackets ≤40cm) to increase stability.

Instructions on how to fix the last partition panel, close to the wall, in case the construction does not leave a walkway
Instructions on how to fix the last partition panel, close to the wall, in case the construction does not leave a walkway

Watch a close-up video of how to install the end panel against the wall:

Step 5: Finish the end of the wall 2-sided plastic partition without aisle

1. Finishing the edge against the wall: Cut out the groove on the wall. Apply glue and stick this bar conceal the right angle brackets fixed in step 4, then shoot the nail to fix it.

Instructions on how to fix the last partition foot, close to the wall, in case the construction does not leave a walkway
Instructions on how to fix the last partition foot, close to the wall, in case the construction does not leave a walkway

2. Finishing the edges close to the ceiling and floor: The installation process of split wall (from Step 1). Apply glue, stick it in the end position, then nail it in place.

Instructions on how to fix the last partition foot, on the ceiling and floor, in case the construction does not leave a walkway
Instructions on how to fix the last partition foot, on the ceiling and floor, in case the construction does not leave a walkway

Step 6: Check and handle the aesthetics of the 2-sided plastic partition without leaving a passage

  1. How to the cohesion and strength of the partition.
  2. Use silicone glue to fill small gaps (between walls, ceilings, floors) to achieve the highest aesthetics and prevent dirt.
Use silicone glue to fill and cover small gaps (between the base of the wall and the wall, floor, ceiling)
Use silicone glue to fill and cover small gaps (between the base of the wall and the wall, floor, ceiling)

Above are 6 steps to construct 2-sided plastic partition without leaving a passage. Kosmos Vietnam is ready to advise you further via the number 0932.067.388